Force Transfer and Deformation Mechanism of Single Ring Structure of Prefabricated Subway Station
DING Peng1,2, TAO Lianjin1,2, YANG Xiuren3, ZHAO Ji3, SHI Cheng1,2, AN Shao1,2
1. College of Civil and Architecture Engineering, Beijing University of Technology, Beijing 100124, China; 2. Key Laboratory of Urban Security and Disaster Engineering of the Ministry of Education, Beijing University of Technology, Beijing 100124, China; 3. Beijing Urban Construction Design & Development Group Co. Ltd., Beijing 100037, China
Abstract:In order to study the mechanical and deformation properties of the new prefabricated subway station, took the first prefabricated subway station in Changchun as the background, based on the large-scale general finite element software ABAQUS, the force transfer and deformation mechanism of the single-ring structure of the prefabricated subway station after assembling into a ring were studied.Four numerical models of different structure types and steel bars bracing combination were established. The mechanical, deformation and joint contact surfaces performances of the structure under the action of self-weight were compared and analyzed. The force transfer and deformation mechanism of the type of prefabricated subway station single ring structure were revealed. The results show that the supporting function of steel bars could not be ignored. After added horizontal steel bars to the outside of arch foot, the maximum Mises stress of the structure was reduced by about 40%, the maximum principal stress was reduced by about 80%, the maximum horizontal displacement was reduced by about 90%, and the deflection of the vault was reduced by about 80%, the shear force and bending moment of the structure decreased obviously. The contact state of the joints changed obviously, and the extrusion area ratio of the other joints increased significantly except the D-E joint of the vault, the assembled structure basically met the design requirements of stable and reliable force transmission, safe and controllable deformation, and the overall self-stabilization ability was significantly improved. The cooperative work of steel bars and assembled structure optimized the transmission path of single-ring structure, limited the horizontal and vertical deformation of the structure effectively, the mechanical and deformation performance of this type of fabricated structure was better than the corresponding index of the cast-in-place structure without the steel bar.
丁鹏, 陶连金, 杨秀仁, 赵继, 石城, 安韶. 预制装配式地铁车站单环结构传力与变形机理[J]. 西南交通大学学报, 2020, 55(5): 1076-1084,1110.
DING Peng, TAO Lianjin, YANG Xiuren, ZHAO Ji, SHI Cheng, AN Shao. Force Transfer and Deformation Mechanism of Single Ring Structure of Prefabricated Subway Station. Journal of SouthWest JiaoTong University, 2020, 55(5): 1076-1084,1110.
DING Peng, TAO Lianjin, YANG Xiuren, et al. Three-dimensional dynamic response analysis of a single-ring structure in a prefabricated subway station[J]. Sustainable Cities and Society, 2019, 45: 271-286
[2]
MARTH V. Achieving sustainability with precast concrete[J]. PCI Journal, 2006, 51(1): 42-61
[3]
TAO Lianjin,DING Peng,SHI Cheng,et al. Shaking table test on seismic response characteristics of prefabricated subway station structure[J]. Tunnelling and Underground Space Technology,2019,91: 102994.1-102994.25.
[4]
AKIN A, SEZER R. A study on strengthening of reinforced concrete frames using precast concrete panels[J]. KSCE Journal of Civil Engineering, 2016, 20(6): 1-8
[5]
HA S K, YU S Y, KIM J S. Experimental study on existing reinforced concrete frames strengthened by L-type precast concrete wall panels to earthquake-proof buildings[J]. KSCE Journal of Civil Engineering, 2018, 22(9): 1-13
[6]
KESNER K, BILLINGTON S L. Investigation of infill panels made from engineered cementitious composites for seismic strengthening and retrofit[J]. Journal of Structural Engineering, 2005, 131(11): 1712-1720
[7]
丁鹏,陶连金,杨秀仁,等. 预制装配式地铁车站闭腔构造优化设计[J]. 北京工业大学学报,2019,45(10): 946-955DING Peng, TAO Lianjin, YANG Xiuren, et al. Optimum design of closed cavity structure for prefabricated metro station[J]. Journal of Beijing University of Technology, 2019, 45(10): 946-955
[8]
丁鹏,杨秀仁,高向宇,等. 单拱大跨预制装配式地铁车站水平与竖直的地震响应[J]. 黑龙江科技大学学报,2018,28(6): 630-637DING Peng, YANG Xiuren, GAO Xiangyu, et al. Horizontal and vertical seismic response of single-arch and large-span prefabricated subway stations[J]. Journal of Heilongjiang University of Science and Technology, 2018, 28(6): 630-637
[9]
杨秀仁,黄美群. 地铁车站预制装配新技术研究策略[J]. 都市快轨交通,2018,31(1): 78-85YANG Xiuren, HUANG Meiqun. Study on seismic performance of sidewall joints in assembled monolithic subway station[J]. China Civil Engineering Journal, 2018, 31(1): 78-85
[10]
赖永标,王梦恕,油新华,等. 隧道与地下工程支护预制技术综述与展望[J]. 建筑技术开发,2015,42(1): 24-28LAI Yongbiao, WANG Mengshu, YOU Xinhua, et al. Overview and outlook for protection and prefabrication techniques of tunnel and underground projects[J]. Building Technique Development, 2015, 42(1): 24-28
[11]
张弛. 法国大跨度隧道预制管片装配法施工技术[J]. 现代世界隧道,1997(2): 10-18
[12]
王德超,王国富,乔南,等. 预制装配式结构在地下工程中的应用及前景分析[J]. 中国科技论文,2018,13(1): 115-120WANG Dechao, WANG Guofu, QIAO Nan, et al. The application and prospect analysis of prefabricated construction in underground engineering[J]. China Science paper, 2018, 13(1): 115-120
[13]
李兆平,王臣,苏会峰,等. 装配式地铁车站结构接头混凝土裂缝及接缝变形规律试验研究[J]. 土木工程学报,2015,48(增刊1):409-413.LI Zhaoping,WANG Chen,SU Huifeng,et al. An experiment study on the evolution law of concrete structure crack and joint seam deformation for tenon groove joints in the prefabricated metro station[J]. China Civil Engineering Journal,2015,48(S1):409-413.
[14]
李兆平,王臣,苏会峰,等. 预制装配式地铁车站结构榫槽式接头力学性能研究[J]. 中国铁道科学,2015,36(5): 7-11LI Zhaoping, WANG Chen, SU Huifeng, et al. Mechanical property of tenon-groove joints for metro station constructed by prefabricated structure[J]. China Railway Science, 2015, 36(5): 7-11
[15]
LIU Hongtao, YAN Qiushi, DU Xiuli. Seismic performance comparison between precast beam joints and cast-in-place beam joints[J]. Advances in Structural Engineering, 2017, 20(9): 1299-1314
[16]
路林海,王国富,王婉婷,等. 地铁车站基坑预制桩-墙结构设计与受力分析[J]. 铁道工程学报,2017,34(10): 93-98LU Linhai, WANG Guofu, WANG Wanting, et al. Research on the structure design and mechanics analysis of the precast pile-retaining wall for metro station[J]. Journal of Railway Engineering Society, 2017, 34(10): 93-98
[17]
路林海,韩帅,陈振兴,等. 采用承插式桩接头的预制方桩受弯承载性能研究[J]. 建筑结构学报,2018,39(2): 153-161LU Linhai, HAN Shuai, CHEN Zhenxing, et al. Study on bending performance of prefabricated square pile with socket and spigot joint[J]. Journal of Building Structures, 2018, 39(2): 153-161